Architecture/Civil engineering PROJECT NAME Daifuku sewerage and paving work CLIENT Sakurai City Hall AREA Sakurai City, Nara Prefecture DATE 2022.4 Construction length: 247.25 m. Excavation and installation of φ200 mm pipes. Installation length: 240.05 m. Return to Architecture/Civil engineering